Introduction
Moisture- related floor covering failures are responsible for over $1 billion annually in damages. The problems range from cupping, buckling, blistering and adhesive failure to discoloration and mold growth. These issues can occur soon after the installation, and in some cases years down the road.
Concrete by its very nature is extremely porous (See figure 1.1); it must have water in order to be workable and in order for the correct chemical reactions to take place for curing. When slabs are not given the proper time or proper conditions to dry, excessive water or vapor can be present in the slab contributing to water or vapor movement. Major culprits for excess moisture vapor include: too much water in the concrete mix, too little curing and or drying time, rainfall from incomplete roofing systems, lack of HVAC climate control and poor landscaping that fails to drain water away from building foundations. Another culprit is buffing the concrete smooth to eliminate potential “telescoping” imperfections in the floor covering. This practice inhibits drying time even more because it seals the concrete’s pores. A related problem that can create undesirable installation surfaces is high alkalinity which can cause a breakdown in the bond of many adhesives. High alkalinity results when too much moisture moves through the slab.


(Fig. 1.1, source: StarLog Volumn VII, Issue 2) (Fig. 1.2, source: StarLog Volume VII, Issue 2)


In addition to the proper interior conditions needed for successful flooring installations, proper use and placement of vapor retarders is critical. Vapor retarders installed beneath the slab can be effective in blocking moisture from migrating upward to the concrete. It is recommended concrete slabs be placed directly on the vapor retarders. (See figure 1.2 above)

Moisture Testing
Two of the more common moisture testing methods in use today when installing resilient flooring are the anhydrous calcium chloride test and the internal relative humidity probe.

The anhydrous calcium chloride test, described in ASTM F-1869-10, Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride measures the moisture vapor emission rate (MVER) of the slab. The relative humidity probe, described in ASTM F-2170-11, Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs using in situ Probes measures the internal relative humidity of the slab. Both test methods have been in practice for many years.

Calcium Chloride Test
The anhydrous calcium chloride test (See Figure 1.3) was developed as a qualitative evaluation of floor moisture condition and became the industry standard in the 1960’s, since then thousands of MVER tests (See Figure 1.4) are run each year in the U.S. In the past decade more and more skepticism concerning the accuracy of this test has been called into question.


(Fig. 1.3) (Fig. 1.4)



Calcium Chloride test benefits: Calcium Chloride test concerns:
Relative Humidity Probe
Relative humidity (RH) testing (See figure 1.5) is determined by in-situ probes installed deep in the slab. Unlike the MVER test which looks at the top to ” of the slab, the ASTM F 2170-11 standard recommends that RH measurements be taken at 40% of the slab depth. For example, on a 4” thick slab, the probes would need to be placed at a depth of approximately 1.5”.



(Fig. 1.5 typical RH probes)

RH Probes test benefits: RH probe test concerns:
Summary
The use of both testing methods performed concurrently in a building offers the greatest depth of data and confidence in decisions to install flooring. A combination of tests is the smarter choice. Test timing is as important as the method because moisture conditions change as a result of natural and man-made forces. Ideally, tests should be conducted on the slab after the building and finish materials have been acclimated to final operating conditions. HVAC systems (heating and air conditioning) in particular, have an effect on moisture in the concrete.

No matter which test is performed, it is important that testing be conducted in accordance with the respective ASTM test method. This will include such factors as proper temperature and humidity, the proper number of tests and test locations and proper subfloor preparation. If these conditions and recommendations are not strictly adhered to then no test method will ever present an accurate assessment of the concrete