Versatrim Molding Adhesive DATA SHEET

SDS

See attachment at bottom for Versatrim Molding Adhesive SDS

For Use With

Product Information

TypeModified Urethane (isocyanate free)
ColorOff white
OdorExtremely low
ApplicatorCartridge
Coverage15-20 lineal feet, depending on application and bead size
Units 10 oz cartridge
Open TimeZero
Working Time45 minutes
Cure Time12 hours
Light Traffic6 hours
Heavy Traffic6 hours
Shelf Life1 year, unopened, at 70°F
Freeze/Thaw StableFreeze/thaw stable to 10°F (-12°C)
While this product is freeze-thaw stable, it is necessary to protect it from freezing.
This product should be stored at temperatures between 50-90°F (15-32°C).
VOC Content< 0.1 g/L
SCAQMD 1168
Clean UpWet – Clean, damp cloth
Partially dry but still soft: Clean cloth with mineral spirits or denatured alcohol. Always check compatibility on a piece of scrap flooring.
AdvantagesNo Shrink Formula
High Strength, Waterproof
No Surface Residue
12-Hour Cure Time
Size10 oz cartridge
Model NumberIndividual Cartridge, USA Label: 00VAD101
Case of 12 Cartridges, USA Label: 00VAD104

Individual Cartridge, Canadian Label: S-VAD101
Case of 12 Cartridges, Canadian Label: S-VAD104

Warranty

For warranty information for Versatrim Molding Adhesive, contact Versatrim at 866-200-8132, www.versatrim.com, or support@versatrim.com.

Recommended Substrates

Will bond to all structurally sound, dry and smooth substrates listed below but refer to molding instructions for specific installation recommendations:

  • APA underlayment grade plywood and OSB
  • Association grade particleboard
  • Cement backer board
  • Cementitious and anhydrite screeds
  • Concrete and radiant heated subfloors that do not exceed 85°F (30°C)
  • Existing well-bonded non-cushion-backed vinyl, tile and sheet flooring
  • Fully secured cork underlayments
  • Gypsum and lightweight concrete with recommended primer
  • Terrazzo (properly prepared with all waxes and surface finishes removed)
  • Well-bonded residue from cutback adhesives

Substrate & Surface Preparation

Follow flooring manufacturer’s guidelines. Substrate must be prepared per ASTM F710 standards including, but not limited to the following:

  • Concrete floors must be dry, clean, smooth and structurally sound. They shall be free of any foreign materials that might prevent adhesive bond, including dust, dirt, solvent, paint, wax, oil, grease, residual adhesive, adhesive removers, incompatible sealers, fire-retardant chemicals, fungicides, release agents, alkaline salts, excessive carbonation, laitance, mold, mildew, and curing, sealing, hardening or parting compounds.
  • Fill all surface cracks, grooves, depressions, control joints and non-moving joints with moisture resistant patching and self-leveling compounds, allow to fully cure and correct high spots before applying adhesive.
  • The substrate, adhesive and flooring must be acclimated in an enclosed building with the HVAC operational between 60-95°F (15-35°C), and between 30-65% relative humidity, for at least 72 hours before, during and after the installation.
  • When installing over radiant heated subfloors, turn the heat off for 24 hours before, during and after installation. Failure to turn the heat off may result in shortened working time of the adhesive. When turning radiant heat back on, raise it incrementally, not to exceed a change of more than 5 degrees per hour to a maximum of 85°F (29°C).
  • Wood underlayments must have a moisture content below 12% using a Tramex or Delmhorst moisture meter.

PRECAUTIONARY NOTES:

  • Concrete must be placed in strict accordance with applicable standards and specifications. An intact moisture vapor retarder must be present below the concrete (see ASTM E1745), must be fully cured (at least 45 days) and without hydrostatic pressure.

Application Instructions

Follow flooring manufacturer’s guidelines for layout, design and any special precautions for installation.

  1. Using a 10 oz caulking gun, apply product to either the back of the molding or to the substrate in a serpentine pattern, making sure to apply a sufficient amount of adhesive for proper bond.
  2. Install molding immediately after adhesive is applied.
    • Working time ~ 45 minutes under acceptable temperature and humidity conditions.
    • Use of approved blue tape to temporarily hold the transition in place may be necessary until installation is complete.

PRECAUTIONARY NOTES:

  • Reseal cap when not in use to protect product. As the adhesive is moisture cured, an opened tube, even if immediately sealed with a cap, will typically cure in the tip within a few days.

Cleaning Instructions

While product is still wet: Use a damp cloth and water to remove.
While product is still soft: Use a remover/stripper, denatured alcohol or mineral spirits. Always
check compatibility on a piece of scrap flooring.

Product Image

Updated on November 7, 2025

Article Attachments